St. Louis Self walking sleeve type lifting platformWhat is the role of description

announcer:hp275HP127226562 release time:2024-05-10 17:36:02

The vibration frequency should be set to obtain large dynamic stress with low energy consumption, and the resonance frequency should be used to handle time dependent vibration. However, there may be one or more resonance peaks in large components, and using resonance peaks with higher peaks and lower frequencies for aging can achieve optimal results. The resonance frequency needs to be determined by trial vibration, which slowly increases the speed of the excitation motor from 0, and determines the relationship curve between the amplitude of the workpiece and the motor speed to determine the resonance point of the workpiece. According to the scanning curve, a large acceleration was obtained at 5366r/min, so 5366r/min was determined as the aging frequency.

Drivers should be responsible for supervising the uniform distribution of items transported by the platform on the platform as much as possible to prevent partial loading and prohibit overloading. flat

St. Louis .Clean and inspect the crown wheel frame assembly, correct or replace with new parts

Emergency stop: Press the emergency button switch to raise or lower the machine.

.The driver shall close and lock the movable doors at both ends of the protective fence before work, and then ring the bell to start. It is strictly prohibited to work with the movable doors of the protective fence open. In case of special circumstances during platform operation, the emergency stop switch can be used to stop the platform. However, during normal operation, it is prohibited to use the emergency stop switch to stop the platform.

Whether the vibration aging treatment has achieved the results can be judged based on the parameter curve observation method.

During aging treatment, the equipment prints the vibration aging curve online. According to the curve, the front end of the a-t curve shows an upward trend, indicating that the damping inside the component decreases after vibration treatment, so the amplitude gradually increases; Since then, the amplitude change has been basically stable, which conforms to the judgment standard of curve observation strip, thus it can be determined that the workpiece has reached the effect. The precautions for using an electric lifting platform are as follows: the user unit should arrange a dedicated person to operate the lifting platform and develop details and safety precautions for the use of the lifting platform based on their own unit's situation, and hang it in a prominent position. When working on an electric lifting platform, professional drivers and operators must be equipped, and they must undergo specialized training and be qualified. They must hold relevant certificates and take on corresponding responsibilities according to the actual situation of the work. After the construction is completed, the lifting platform needs to be moved on the site and should be operated by a professional driver. Before daily work, zy12 drivers must carefully check the electrical, and mechanical systems of the platform, check the working range of the lifting platform truck and remove obstacles that hinder the rotation and walking of the lifting platform truck. And empty the platform up and down several times to check for any faults or abnormal phenomena. It is also necessary to pay attention to the accuracy of the platform platform landing station for any obvious abnormal differences. Professional improvement of quality assurance for aircraft manufacturers. The promotional activity is ongoing, and new and old customers are welcome to come for consultation


St. Louis Self walking sleeve type lifting platformWhat is the role of description



The arrangement of vibration points should be based on the vibration aging process standard GB/T25712-20. The vibration aging exciter should be placed at a position with high rigidity and amplitude of the workpiece, and its rotating axis should be parallel to the plane where the effective zone of the vibration mode is located. The exciter should be fixed at the end angle or edge of the workpiece with high rigidity, so that small energy can be used to excite the component with large amplitude. Based on the structural shape of the foundation, we set the vibration points on the protruding plates on each side of the workpiece.

Check the wear condition of the pinion and rack, please refer to the instruction manual for specific requirements

Thermal aging stress relief is generally suitable for small workpieces, while the lifting foundation structure has a large volume and does not have a large enough annealing furnace. Using natural aging takes one year and the production cycle is too long, so neither of these two methods is feasible. After research and understanding by the manufacturer it was found that selecting appropriate support points for large welded structural components can perform vibration aging stress relief. Therefore, the manufacturer has decided to use vibration aging for stress relief of the platform lifting foundation. Long term promotion of downgrading manufacturers, 20 year old brand, with price advantages and guaranteed quality!

A complete range of products.Heavy load capacity: protective plate form: 90° Or 180° Interchangeable configuration rocker working angle: 75° Drive method: hydraulic power unit drive or screw drive.

The driver shall close and lock the movable doors at both ends of the protective fence before work, and then ring the bell to start. It is strictly prohibited to work with the movable doors of the protective fence open. In case of special circumstances during platform operation, the emergency stop switch can be used to stop the platform. However, during normal operation, it is prohibited to use the emergency stop switch to stop the platform.

Power supply voltage: Motor power: Lifting: Rocker self reset switch operation Overload protection: Over current relay.


St. Louis Self walking sleeve type lifting platformWhat is the role of description



Whether the vibration aging treatment has achieved the results can be judged based on the parameter curve observation method.

Statistics.The arrangement of vibration points should be based on the vibration aging process standard GB/T25712-20. The vibration aging exciter should be placed at a position with high rigidity and amplitude of the workpiece, and its rotating axis should be parallel to the plane where the effective zone of the vibration mode is located. The exciter should be fixed at the end angle or edge of the workpiece with high rigidity, so that small energy can be used to excite the component with large amplitude. Based on the structural shape of the foundation, we set the vibration points on the protruding plates on each side of the workpiece.

When disassembling the hydraulic oil tank filler cap filter cover, inspection hole, hydraulic oil pipe and other parts, it is necessary to avoid dust during the system oil passage. The disassembled parts must be thoroughly cleaned before opening. When disassembling the hydraulic oil tank filler cap, first remove the soil around the tank cap. After loosening the tank cap, materials that do not remove fiber impurities and specialized hammers with rubber attached to the surface should be selected. Hydraulic components and hydraulic hoses should be carefully cleaned, dried with high-pressure air, and then assembled. Choose a well packaged filter element (the inner packaging is damaged, although the filter element is intact, it may also be unclean). When changing the oil, clean the filter at the same time. Before installing the filter element, carefully clean the bottom dirt inside the filter housing with materials.

Firstly, it is necessary to start from the source. The current technology is relatively advanced. When manufacturing aluminum alloy lifting platforms,St. Louis Mobile boarding bridge manufacturer, adding chromium, nickel,St. Louis Fixed hydraulic lifting platform, etc. to ordinary steel to make stainless steel, changing the internal structure of the metal to prevent rust.

St. Louis .Thermal aging stress relief is generally suitable for small workpieces, while the lifting foundation structure has a large volume and does not have a large enough annealing furnace. Using natural aging takes one year and the production cycle is too long, so neither of these two methods is feasible. After research and understanding by the manufacturer, it was found that selecting appropriate support points for large welded structural components can perform vibration aging stress relief. Therefore, the manufacturer has decided to use vibration aging for stress relief of the platform lifting foundation. Long term promotion of downgrading manufacturers, 20 year old brand, with price advantages and guaranteed quality!

The driver shall close and lock the movable doors at both ends of the protective fence before work and then ring the bell to start. It is strictly prohibited to work with the movable doors of the protective fence open. In case of special circumstances during platform operation, during normal operation,St. Louis Large mobile lifting platform, it is prohibited to use the emergency stop switch to stop the platform.

The selection of vibration pickup points refers to the placement point of the sensor, which is used to measure the vibration amplitude of the workpiece. According to GB/T25712-2010, the acceleration sensor should be placed on the workpiece with a certain rigidity and a large amplitude, and its testing direction should be adjusted to be perpendicular to the plane where the effective zone of the vibration mode is located. Considering the complex structure of the lifting foundation workpiece and the uneven thickness of each component, the vibration pickup point is set in a thick area in the middle of the component.