ChifengAluminum alloy indoor elevatorHow to operate during construction

announcer:hp750HP120486450 release time:2024-04-29 10:34:00

According to the number of masts, which is an early aluminum alloy elevator. The entire machine is light in weight and flexible in movement, suitable for single person operation. After condensation it can enter general standard doorways and elevators in buildings.

Double masted aluminum alloy lifting platform: a new generation product of the design, made entirely of high-strength aluminum profiles. Due to the high strength of the profiles, the deflection of the lifting platform is minimal. Adopting a double mast column structure, it has a large load capacity, a large platform area, excellent stability, flexible operation, and convenient implementation. Its appearance allows for high lifting capacity in extremely small spaces. This elevator is widely used for three masted aluminum alloy lifting platforms: three sets of masts support the operation platform for synchronous lifting, and the support structure is the same as a single masted platform with super large load capacity and work stability. The overall lifting guardrail device has good strength and greatly reduces the height of the entire machine during transportation. It is very convenient for loading and unloading, and can be assembled or disassembled in one lift. The elevator has a strong load-bearing capacity and is suitable for two people (who can carry a certain amount of weight tools and materials) to climb high at the same time; Various non-standard products can also be customized according to different environments to meet different needs.

Chifeng.If this situation is not checked in a timely manner, the potential problems will be very significant. If you develop maintenance habits, you can conduct good inspections of the platform before and after use.

After 1500 hours of operation of the elevator, minor repairs will be carried out to the mechanical and electrical systems. Professional aluminum alloy elevator manufacturer is safe, environmentally friendly, and economical! Our products are exported to foreign countries and highly trusted

.. Before the maintenance of the hydraulic aluminum alloy elevator starts, the tools used must be counted. After the maintenance is completed, the tools should be classified and organized, and counted to prevent the tools used for maintenance from being left inside the equipment, especially in the distribution box. When repairing the hydraulic system of the aluminum alloy elevator, it is necessary to keep the maintenance site clean and dust-free. When repairing and fastening screws for aluminum alloy elevators, it is necessary to use the correct diagonal first. When tightening screws, use a torque wrench to prevent excessive damage to the screws. After the maintenance is completed and before the power on test, it is necessary to count the number of maintenance personnel to ensure that there is no one inside the aluminum alloy elevator. This is very necessary for the maintenance of large fixed hydraulic elevators. After counting the number of people, inspecting and repairing the equipment and the maintenance site, the power transmission test can only be carried out. After the maintenance of the aluminum alloy elevator is completed, the equipment maintenance record must be filled out. The maintenance record should include the equipment maintenance date, the personnel participating in the maintenance, the maintenance items, model and specification of the replaced parts, the effectiveness of the maintenance, and whether the equipment still has problems after the maintenance is completed.

Three masts aluminum alloy elevator: The main structure is made of high-quality high-strength aluminum profiles,ChifengAluminum alloy elevator for high-altitude operation, with super large load capacity and working stability. The overall lifting guardrail device has good strength, and making loading and unloading convenient. This machine has strong load-bearing capacity and is suitable for 2-3 people to climb heights simultaneously.

Regularly check the connection of each part and tighten it if there is any looseness. The tightness of the body connecting bolts should be checked when the body is under pressure (the rotating arm can be used to cause compression), and all connecting shafts must have split pins and be sufficient. Professional items


ChifengAluminum alloy indoor elevatorHow to operate during construction



In low concentration carbon monoxide gas. It can cause symptoms such as headache, shortness of breath, nausea and vomiting,ChifengAluminum alloy lifting frame ladder, body weakness and dizziness, psychological confusion, and even brain damage. In severe cases, it can cause death, such as starting the engine of the equipment in the garage.

Electrical part: It consists of power, signal, and lighting devices.

Multi mast aluminum alloy lifting platform: the whole platform is refined by high-strength aluminum profiles. Due to the high strength of the profiles, the four mast structure is adopted, which has excellent stability, flexible operation, large load capacity, large platform area and convenient implementation. Its appearance allows for high lifting capacity in extremely small spaces. Minimize the deflection of the lifting platform.

Packaging strategy.Regularly check the connection of each part and tighten it if there is any looseness. The tightness of the body connecting bolts should be checked when the body is under pressure (the rotating arm can be used to cause compression) and all connecting shafts must have split pins and be sufficient. Professional items

Next, and strictly prohibit illegal operations.


ChifengAluminum alloy indoor elevatorHow to operate during construction



. Before the maintenance of the hydraulic aluminum alloy elevator starts let's talk about the maintenance and upkeep of mechanical equipment for aluminum alloy elevators: the brakes of each mechanism should be regularly inspected and adjusted to ensure flexibility and reliability.

Strictly follow the operating instructions of the aluminum alloy elevator for safe use, the tools used must be counted. After the maintenance is completed, the tools should be classified and organized, and counted to prevent the tools used for maintenance from being left inside the equipment, especially in the distribution box. When repairing the hydraulic system of the aluminum alloy elevator, it is necessary to keep the maintenance site clean and dust-free. When repairing and fastening screws for aluminum alloy elevators, it is necessary to use the correct diagonal first. When tightening screws, use a torque wrench to prevent excessive damage to the screws. After the maintenance is completed and before the power on test, it is necessary to count the number of maintenance personnel to ensure that there is no one inside the aluminum alloy elevator. This is very necessary for the maintenance of large fixed hydraulic elevators. After counting the number of people, inspecting and repairing the equipment and the maintenance site, the power transmission test can only be carried out. After the maintenance of the aluminum alloy elevator is completed, the equipment maintenance record must be filled out. The maintenance record should include the equipment maintenance date, the personnel participating in the maintenance, the maintenance items, the brand, model and specification of the replaced parts, the effectiveness of the maintenance, and whether the equipment still has problems after the maintenance is completed.

How much is it.Aluminum alloy elevators play an important role in handling, construction, and other operations, providing convenient transportation equipment. More and more aluminum alloy elevators are being put into use in the market, but unstable voltage during use can have a certain impact on aluminum alloy elevators.

3 oil cylinder part: It is composed of one or more oil cylinders of the lifting oil cylinder straight top platform or the lifting shear fork frame.

After 5000 hours of operation of the elevator, carry out medium maintenance on the mechanical and electrical systems.

Chifeng.Hydraulic lifting platforms can be divided into: four wheel mobile, two wheel traction, car modification, car type, and lifting heights ranging from 4 meters to 18 meters. This series of products has a load capacity of 0.1 to 0.8 tons, and can also be customized according to user requirements, with a high load capacity of up to 10 tons.

Problem: The power indicator light of the aluminum alloy elevator is not on, and the lifting does not operate. Method: Check whether the power cord is correctly connected to the power socket; Check whether the circuit breaker switch is closed and whether the leakage protection switch is tripped.

On the friction surface there should be no dirt present, and any dirt must be washed off with gasoline or thinner.