Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.

In addition to ground protective fences, low level doors can be used. Low level doors should meet the following requirements: the height of the door should be between 1m and 2m. And there should be at least protective railings, a half height middle crossbar, and a toe board at least 150mm above the ground.

Sauergo taoeryang.When charging, it is necessary to charge it in a timely manner. When the equipment is used for about 2 months (according to the actual frequency of use), it is necessary to add grease to the rotating parts once; Regularly inspect the working status of the pin shaft of the fully self-propelled electric elevator every month, and if any pin shaft is found

It is reported that a fixed electric elevator has good lifting stability and can only be used for fixed operations, making high-altitude operations easier

.Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark,Sauergo taoeryangElectric elevator mobile type, sticky, or has foreign objects such as gravel,Sauergo taoeryangMigao Electric Elevator, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m,Sauergo taoeryangElectric tatami elevator, it is allowed to lower the height of the lower door opening but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

It is understood that the scissor type lifting platform is a widely used specialized equipment for high-altitude operations. Its shear fork mechanical structure provides high stability for the lifting platform, wide working platform, and high load-bearing capacity making the range of high-altitude operations larger and suitable for multiple people working simultaneously. The lifting power is divided into 24V, 220V or 380V power supplies, diesel engines, using Italian and domestic hydraulic pump stations, and the table top is equipped with anti slip insulation buckle plates, insulation and safety features. Please rest assured to use.


Sauergo taoeryangElectric elevator lifting 10 metersBasic operating conditions and application parameters



After the electric elevator passes the inspection, the user unit shall organize the leasing unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Unloading platform and attached electric construction platform, etc.

Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, and ensure that the lifting platform can be lifted to the rated lifting height.

Free consultation.Mechanical devices controlled by cage movement should not be used to open or close the landing door.

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Stage equipment safety door. To prevent personnel from extending their heads, hands, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed, its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than 8 meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.


Sauergo taoeryangElectric elevator lifting 10 metersBasic operating conditions and application parameters



The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

Create brilliance.The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

The noise of aluminum alloy electric elevators during operation is relatively low. If the noise is high, it is abnormal. Therefore, it is necessary to do a good job in troubleshooting, find the cause in a timely manner, reduce noise pollution, and reduce dangerous accidents

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Sauergo taoeryang.Speed limiter. To prevent the driving speed from exceeding the normal speed. A speedometer should be installed (not required for floors below or including the second floor), which is an individual mechanism that is integrated with a safety clamp; The entrance and exit of the passenger compartment should be equipped with safety doors. Public places, family dormitories, and

Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent

During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.