CibitokeS13-m-200 power transformerIntroduction and working principle characteristics

announcer:hp122HP117294921 release time:2024-04-19 09:49:29

When sampling in bulk gasoline barrels, samples shall be selected according to 5% of the number of gasoline barrels, but not less than 2 barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to 2% of the total number of barrels (bottles).

The key reason for oil leakage is that there are defects in cast iron parts

Cibitoke.The cycle time of power-off cleaning and inspection shall be determined according to the surrounding environment and load conditions, generally from half a year to once a year;

Careless maintenance and insulation damage

.In specific daily life we have a certain understanding of the optical wavelength of oil immersed transformer. What kind of function does it have for transformer?

The method and whole process of taking oil sample of power transformer are as follows:

When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.


CibitokeS13-m-200 power transformerIntroduction and working principle characteristics



Oil leakage at looper flange

There is a magnetic induction line crossing in the transformer core, which will cause induced electromotive force on the plan with the magnetic induction line. Because this electric flow creates a closed loop to generate an electric field and forms a vortex, it is called vortex. The existence of vortex makes the transformer core hot and consumes kinetic energy. This kind of loss is called vortex loss.

Different diversion methods, dry-type transformers mostly use silica gel waterproof casing, while oil transformers mostly use porcelain waterproof casing;

plan.Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area,CibitokePower supply transformer, voltage transformation and blood pressure reduction must be carried out by the transformer.

Operation of oil immersed transformer

Dry type transformer factory


CibitokeS13-m-200 power transformerIntroduction and working principle characteristics



Oil leakage of heat pipe radiator

How many?.After sampling so as to meet the needs of power consumption. In short, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.

In fact, apart from the application of the Finance Bureau, the industry has been trying to formulate and upgrade transformer commodities according to the specifications, so as to promote the improvement of energy consumption level of transformer commodities.

Before application,CibitokeTransformer circuit, the sampling container shall be cleaned with vehicle gasoline,CibitokeTest standard for oil immersed transformers, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.

Cibitoke.Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.

The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.

The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.