As suwayrahModel and specification of power transformerProfession is king

announcer:hp122HP117294921 release time:2024-03-29 13:06:02

Oil leakage at electric welding position

If the above provisions are not met, the problem of dryness shall be solved. Generally, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N2 shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, and there shall be no dirt.

As suwayrah.Two point grounding device of iron core caused by residual welding scar;

After 24 hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.

.The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity while oil transformer has better load working capacity.

When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover,As suwayrahWithstand voltage of 10kV oil immersed transformer, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe,

Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage it shall be handled properly.


As suwayrahModel and specification of power transformerProfession is king



The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min, and the time interval of each closing shall not be less than 5min.

A kind of power engineering equipment that converts the working voltage and current according to the basic law of magnetic effect of current. In the whole process of power transmission and transformation of power engineering,As suwayrahPrice of scb11 series dry type transformer, it is necessary to carry out voltage transformation and blood pressure reduction according to the transformer to reduce the loss of electromagnetic energy in the whole process. Therefore, the power consumption of the processing plant is all connected with 10kV switching power supply, samples shall be selected according to 5% of the number of gasoline barrels, but not less than 2 barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to 2% of the total number of barrels (bottles).

How many?.When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation,As suwayrahDelivery test report of dry-type transformer, power off immediately for maintenance.

Power saving analysis of transformer

When sampling in bulk gasoline barrels, samples shall be selected according to 5% of the number of gasoline barrels, but not less than 2 barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to 2% of the total number of barrels (bottles).

As suwayrah.Power transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage, and can be equipped with safety protective casing according to different waterproof grades. It is applicable to key or unique natural environment sites such as multi-storey buildings, airports, tunnel construction, chemical enterprises and factories.

Wiring mode of dry-type transformer:

Different diversion methods, dry-type transformers mostly use silica gel waterproof casing