SabzevalHigh current transformerPublish Operation Guide

announcer:hp122HP117294921 release time:2024-03-28 12:48:10

The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.

After no-load test run is normal for 24h, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

Sabzeval.It is understood that in China,SabzevalInternal structure diagram of oil immersed transformer, transformers have experienced the whole process of replacing many series products such as sss11. As early as the middle and late 1980s, urban power grids have been transformed all over the country, and S9 series distribution transformers have been used to replace S7 Series. In recent years, S13 and S15 commodities are gradually selected in large quantities in the transformation of urban and rural power networks in China, and their full load loss is 50% - 80% less than that of S9 transformer.

When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, the winding of oil immersed transformer is generally divided into multiple modules, and each module is replaced by an equivalent circuit, and its power circuit includes an inductance and vertical capacitance, a capacitance to ground or capacitance between windings, They also have mutual inductors between the inductors of each module, and collect the chain Internet as the equivalent power circuit of oil immersed transformer. The precision of the conclusion can completely meet the needs of practical projects.

.The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by 20%.

When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases, power off immediately for maintenance.

If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear 4 round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for 100mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body and rotate the crane to place the bell cover on the clean skid.


SabzevalHigh current transformerPublish Operation Guide



(5) the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator,SabzevalWhat are the pressure regulators, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.

The equipment can eliminate the shortcomings found in the patrol inspection, remove and replace the cracked or brittle leather pad, check and tighten the node, replenish the oil with less oil, check and replace the silica gel of the breathing mask, oil immersed transformers are released outward in the form of waves. This kind of wave is like a tide. It is also a kind of kinetic energy. In fact the wave height of oil immersed transformer also shows the size of kinetic energy. Generally, computer automatic system is used to control the wavelength and frequency of electromagnetic wave. The longer the light wavelength is, the greater the output power is. On the contrary, it is very small.

middleman.Power transformer

Noise pollution control and prevention measures of dry-type transformer

Equipped with a temperature controller, platinum thermistor (pt10) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, set up common problem alarm, overtemperature alarm and overtemperature tripping effect, and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.


SabzevalHigh current transformerPublish Operation Guide



Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated,SabzevalIs there oil in dry-type transformer, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.

Customer first.Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying the treatment goal can be achieved.

At that time, only a few companies in China could produce 500kV high-voltage transformers, and the market share of high-voltage transformers was basically monopolized by overseas leaders.

Brief introduction of zero line of power transformer

Sabzeval.The insulating layer in the middle of the silicon steel plate is aging, the anchor bolt cover with the iron core is damaged, the iron core causes large vortex, resulting in heat, temperature rise, and the aging of the insulating layer is accelerated. The core insulation compressive strength of power transformer must be measured on time and accurately. If it is found that the insulation compressive strength is less than the index value, please remove and replace the anchor bolt cover or carry out insulation for the copper core cable.

If the oil immersed transformer is burned by the cover of the transformer, when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard, the fire brigade must be notified.

If the oil immersed transformer is burned by the cover of the transformer when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard the fire brigade must be notified.