LecceGuide rail lifting cargo elevatorTechnical requirements that should be met

announcer:hp779HP136589660 release time:2024-02-26 12:34:03

After the goods are transported, clean the platform.

Many people believe that the mechanical strength of the elevator itself is relatively high when using the elevator, so the installation method specified in the manual is not strictly followed during the installation process. However, this can lead to increased wear of parts and inflexibility in operation. In addition, it is necessary to pay attention to the installation precautions corresponding to the working environment and not be careless. Correct installation, use, and maintenance of the elevator are important steps to ensure the normal operation of mechanical equipment. Therefore, when installing the elevator, please be sure to carefully assemble and use it in strict accordance with the following installation and use related matters.

Lecce.Replace with new oil and do not intermittently use the old oil,LecceElevating cargo elevator, otherwise the moving parts in the system will accelerate wear.

Motor connection error. When the triangular connection motor is mistakenly connected into a star shape, the motor still operates with full load, and the current flowing through the stator winding exceeds the rated current, leading to the motor stopping itself. If the stopping time is slightly longer and the power supply is not cut off, the winding will not only be severely overheated, but also burned. When a star connected motor is mistakenly connected into a triangle, or when several coil groups are connected in series into a single branch, the motor is mistakenly connected into two branches in parallel, and in severe cases, the windings will be burned.

.Before connecting the motor to the elevator, the elevator manufacturer should first make the motor shaft keyway perpendicular to the tightening bolt. To ensure uniform stress, first screw on the mounting bolts at any diagonal position, but do not tighten them. Then screw on the other two mounting bolts at diagonal positions, and then tighten the four mounting bolts one by one. After that, tighten the tightening bolts. All tightening bolts shall be fixed with a torque wrench according to the indicated fixed torque data, and the use of elevators and lifting platforms shall be checked

It should be noted that compared to some lifting platforms in certain venues, when personnel ask if you need to add guardrails, do not blindly refuse, and consider whether it is necessary based on the site of use. 'In addition, it is necessary to possess two types of certificates, namely, the Special Equipment Manufacturing License of the People's Republic of China and the Special Equipment Installation, Transformation, and Maintenance License of the People's Republic of China, before production, installation, and maintenance can be conducted. Therefore, it is necessary to ask the manufacturer whether they possess these two types of certificates.'.

Different. (Specific bearing capacity and lifting height can be designed and customized according to user requirements)


LecceGuide rail lifting cargo elevatorTechnical requirements that should be met



Unscrew the screws on the dustproof hole on the outer side of the elevator flange,LecceFixed simple lifting cargo elevator, adjust the PCS system ring to align its side hole with the dustproof hole, and tighten with the hexagon socket. After that, remove the motor shaft key.

'Before installing the elevator bearings, we should never open the packaging prematurely. This can easily lead to premature bearing contamination, which can lead to premature bearing damage. In addition, when installing,LecceFactory freight elevator lifting, it is necessary to ensure that the device environment is clean and not to bring iron filings, dust, and other things into the bearings, as even some small dust,', If it continues for a long time, it will also affect the running-in between bearings, leading to a decrease in the life of the elevator.

The hydraulic lifting platform mainly uses hydraulic oil pressure transmission to achieve the lifting function. Its shear fork mechanical structure provides stability for the lift. The wide working platform and high bearing capacity make the high-altitude operation range wide and suitable for multiple people to work simultaneously. It makes aerial work efficient and guaranteed.

Honesty and mutual benefit.Knowledge popularization and superior performance of scissor fork type fixed lifting platform: equipped with safety devices to prevent overloading of the lifting platform; Equipped with a protection valve to prevent hydraulic oil pipe from cracking; Equipped with an emergency lowering device for sudden power failure; The doors of the upper and lower floors are equipped with safety devices that interlock with the system.

Different. (Specific bearing capacity and lifting height can be designed and customized according to user requirements)

In addition, it is strictly prohibited to use a hammer during installation to prevent excessive axial or radial force from damaging the bearings or gears. Be sure to tighten the mounting bolts before tightening the tension bolts. Before installation, clean the anti rust oil on the motor input shaft, positioning boss, and elevator connection parts with gasoline or zinc sodium water. Its purpose is to ensure the tightness of the connection and the flexibility of operation, a hydraulic mechanism, an electric mechanism, and a support mechanism. The hydraulic oil forms a certain pressure by a vane pump, and enters the lower end of the hydraulic cylinder through an oil filter, flameproof electromagnetic directional valve throttle valve, hydraulic control one-way valve, and balance valve. This allows the hydraulic cylinder to move upward and lift heavy objects. The return oil from the upper end of the hydraulic cylinder returns to the tank through the flameproof electromagnetic directional valve, and its rated pressure overflow valve is adjusted. Observe the reading value of the pressure gauge on the pressure gauge.

Statistics.After the goods are transported, clean the platform.

After careful inspection, it was found that there were two main causes: loss of hydraulic pressure, and leakage of hydraulic valves or seals.

What is the new price for fixed elevators? Professional improvement of the quality assurance of the elevator factory. Preferential activities are ongoing, welcome new and old customers to consult

Lecce.The elevator is a kind of elevator equipment composed of a walking mechanism, a hydraulic mechanism, an electric mechanism, and a support mechanism. The hydraulic oil forms a certain pressure by a vane pump, and enters the lower end of the hydraulic cylinder through an oil filter, flameproof electromagnetic directional valve, throttle valve hydraulic control one-way valve, and its rated pressure overflow valve is adjusted. Observe the reading value of the pressure gauge on the pressure gauge.

Unscrew the screws on the dustproof hole on the outer side of the elevator flange and balance valve. This allows the hydraulic cylinder to move upward and lift heavy objects. The return oil from the upper end of the hydraulic cylinder returns to the tank through the flameproof electromagnetic directional valve, adjust the PCS system ring to align its side hole with the dustproof hole, and tighten with the hexagon socket. After that, remove the motor shaft key.

It should be noted that compared to some lifting platforms in certain venues, protective barriers are generally added to the platform. As lifting platforms belong to special equipment the National Quality Inspection Bureau strictly inspects this area. Any lifting platforms that are deemed to have safety hazards must be removed. Therefore, when personnel ask if you need to add guardrails, do not blindly refuse, and consider whether it is necessary based on the site of use. 'In addition, namely, the Special Equipment Manufacturing License of the People's Republic of China and the Special Equipment Installation Transformation, and Maintenance License of the People's Republic of China, before production, installation, and maintenance can be conducted. Therefore, it is necessary to ask the manufacturer whether they possess these two types of certificates.'.