San Jose10kV oil immersed distribution transformerCarrier volatility

announcer:hp122HP117294921 release time:2024-02-13 13:48:13

When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.

San Jose.Hand touch method for transformer inspection

For the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation it is very easy to cause fire accidents, power failure damage to machinery and equipment, etc.

.Noise pollution control and prevention measures of dry-type transformer

Dry type transformer manufacturer

When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.


San Jose10kV oil immersed distribution transformerCarrier volatility



After sampling,San JoseTransformer and box transformer, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.

After the power transformer has been used for a long time, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:

The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, so as to promote the safety of dry-type transformer!

total cost.The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the 45 degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust, and has sound insulation and noise reduction.

The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by 20%.

The insulating layer in the middle of the silicon steel plate is aging, the anchor bolt cover with the iron core is damaged the iron core causes large vortex, resulting in heat, temperature rise,San JoseDry type transformer 1250kva, please remove and replace the anchor bolt cover or carry out insulation for the copper core cable.


San Jose10kV oil immersed distribution transformerCarrier volatility



For the installation of lightning rod,San JoseDirect transformer, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents, power failure, damage to machinery and equipment, etc.

project.For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.

Several detection methods for installing transformer

Power transformer

San Jose.There are many connection groups of dry-type transformers, and the selected structures and connections are also different. Then, what are the groups of dry-type transformers? How to carry out the connection? Or basically introduce it with the network of dry-type transformer manufacturers.

Dry type transformer

The hanging core of dry-type transformer is a vital part