MestreGuide rail chain lifting cargo elevatorProduction value continues to increase

announcer:hp779HP136589660 release time:2023-12-19 09:07:54

In addition, it is strictly prohibited to use a hammer during installation to prevent excessive axial or radial force from damaging the bearings or gears. Be sure to tighten the mounting bolts before tightening the tension bolts. Before installation, clean the anti rust oil on the motor input shaft, positioning boss, and elevator connection parts with gasoline or zinc sodium water. Its purpose is to ensure the tightness of the connection and the flexibility of operation, and to prevent unnecessary wear and tear.

Several types: motor winding open circuit. When one phase of the motor winding is open circuit, or one of the parallel branches is open circuit, it will cause three-phase current imbalance and cause the motor to overheat.

Mestre.After careful inspection, it was found that there were two main causes: loss of hydraulic pressure, and leakage of hydraulic valves or seals.

Does the cleanliness of the hydraulic station have relevant rules and requirements?

.It is good for aerial work vehicles not to cover their clothes and park outside. If it is windy and rainy, the clothes will repeatedly slap the car paint, especially if the vehicle blows sand on the clothes causing many fine scratches on them, as the paint will become black over time. In addition, when the wind does not directly spray powder or clean the mechanism on the sand, it should be washed with water, and prevent the vacuum cleaner of the aerial work vehicle from scratching the sand particles on the paint surface.

Goods should be stacked well on the platform, and should not be tilted. When the goods elevator is lifting or lowering beyond the scope of the platform, no one should stand around to watch.

Motor connection error. When the triangular connection motor is mistakenly connected into a star shape, the motor still operates with full load, and the current flowing through the stator winding exceeds the rated current, leading to the motor stopping itself. If the stopping time is slightly longer and the power supply is not cut off, the winding will not only be severely overheated,MestreElevating cargo elevator factory building, but also burned. When a star connected motor is mistakenly connected into a triangle, or when several coil groups are connected in series into a single branch, the motor is mistakenly connected into two branches in parallel, both the windings and the iron core will overheat, and in severe cases, the windings will be burned.


MestreGuide rail chain lifting cargo elevatorProduction value continues to increase



Precautions for elevator installation: Keep the access road of external construction elevators smooth and have sufficient space for parking equipment. When using a steam crane for auxiliary installation, full consideration should be given to whether the on-site environment meets the operating conditions of the steam crane.

Small pneumatic or electric derusting, which uses the principle of friction generated by air compression or electromagnetic effects to polish and remove rust on the surface of a spiral elevator, can be used for precision instrument push rods or for enterprises that require micro operation of spiral elevators.

Different. (Specific bearing capacity and lifting height can be designed and customized according to user requirements)

Encyclopedic knowledge.Outriggers: mechanical outriggers, ordinary hand cranking outriggers, and pull-out outriggers.

For guideway elevators installed outdoors, they are often exposed to rain and sunlight, so special attention should be paid to regular maintenance and inspection to avoid accidents.

Secondly, there should be no dirt on the friction surface. If there is any dirt, it should be washed off with gasoline or thinner; The reduction gearbox, external meshing gear, and other parts of the equipment as well as the hydraulic oil, must be tested according to the requirements in the table; Correct maintenance of the hydraulic guide rail elevator: Regularly inspect the wire ropes at various parts for broken wires and looseness. If any such phenomenon is found, replace it in a timely manner. The maintenance of the wire ropes must be carried out in strict accordance with the specifications; Check the connection condition of each part according to the braking rules and regulations. If there is any looseness, tighten it in a timely manner. Check the tightness of the connecting bolts of the equipment when the body is under pressure. All connecting shafts should be equipped with cotter pins; Check whether the operation of each mechanism is normal, whether there are noises and faults according to regulations, and promptly remove all faults; When installing disassembling, it is important to note that the reducer and the gear center line should be parallel, and the meshing clearance should be appropriate; Regularly conduct a comprehensive inspection of the equipment to see if there is any damage to the wires and cables,MestreHydraulic guide rail type cargo elevator, and if there is overheating of the motor. Replace the motor in a timely manner and eliminate the fault before continuing operation; Ensure that the bearings, boxes, distribution boxes, and that the travel switch points of each safety device must be safe and reliable.


MestreGuide rail chain lifting cargo elevatorProduction value continues to increase



The motor winding is short-circuited. When a short circuit fault occurs in the motor winding, the short circuit current is much larger than the normal working current, which increases the copper loss of the winding, causing the winding to overheat or even burn out.

Production department.To ensure excellent power supply at the installation site, install a separate distribution box. When using the distribution box the electrical leakage switch must meet the requirements for construction elevators. If the installed construction elevator is variable frequency, the selection of the leakage switch should be compatible with the frequency converter.

As we all know now, elevators and lifting platforms have been widely used in recent years to solve the problems we encounter in daily life. Because working at heights is a high-risk profession that requires the assistance of auxiliary tools to complete certain tasks, the use of elevators is undoubtedly emerging in the domestic machinery market and has been vigorously developed.

In addition, it is strictly prohibited to use a hammer during installation to prevent excessive axial or radial force from damaging the bearings or gears. Be sure to tighten the mounting bolts before tightening the tension bolts. Before installation, clean the anti rust oil on the motor input shaft, positioning boss, and elevator connection parts with gasoline or zinc sodium water. Its purpose is to ensure the tightness of the connection and the flexibility of operation,MestreElectric cargo elevator, and to prevent unnecessary wear and tear.

Mestre.Precautions for elevator installation: Keep the access road of external construction elevators smooth and have sufficient space for parking equipment. When using a steam crane for auxiliary installation, full consideration should be given to whether the on-site environment meets the operating conditions of the steam crane.

In addition, it is strictly prohibited to use a hammer during installation to prevent excessive axial or radial force from damaging the bearings or gears. Be sure to tighten the mounting bolts before tightening the tension bolts. Before installation, clean the anti rust oil on the motor input shaft, positioning boss, and elevator connection parts with gasoline or zinc sodium water. Its purpose is to ensure the tightness of the connection and the flexibility of operation, and to prevent unnecessary wear and tear.

Knowledge popularization and superior performance of scissor fork type fixed lifting platform: equipped with safety devices to prevent overloading of the lifting platform; Equipped with a protection valve to prevent hydraulic oil pipe from cracking; Equipped with an emergency lowering device for sudden power failure; The doors of the upper and lower floors are equipped with safety devices that interlock with the system.