Munich Lim AirportHydraulic boarding bridge mobile typeComparison of impeller width

announcer:hp161HP196399230 release time:2024-02-20 11:32:39

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

Do you know some of the working characteristics of hydraulic lifting boarding bridges? Today,Munich Lim AirportMaintenance of boarding bridge, I will take you to understand!

Munich Lim Airport.Application of hydraulic boarding bridges: Hydraulic boarding bridges can be widely used in docks, platforms, warehouses, etc. according to user needs. Special designs can be made in terms of external dimensions, load, etc. The fixed boarding bridge is installed on the side of the cargo platform, flush with the ground and side of the cargo platform. The bridge deck of a fixed boarding bridge can tilt up and down, making it equal to the height of the carriage. There is a flip board at the top of the bridge, which automatically attaches to the edge of the carriage, ensuring a smooth passage between the cargo platform and the carriage.

When it comes to fixed hydraulic boarding bridges, I believe

.When working on the hydraulic boarding bridge, the support legs must be extended, and the support leg bolts must be adjusted to ensure that the lifting platform is stably stressed on the support legs and kept horizontal; During the lifting process and in the lifting state, the lifting platform must not be moved, and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use, check whether the electrical equipment is normal; All shaft pin oil holes must be oiled before each use. Before use, it is necessary to perform no-load lifting and check whether the hydraulic system is normal; The load of the workbench should not exceed the rated value, and it should not be subjected to intense manual shaking; The hydraulic oil in the oil tank must be replaced every 500 hours of operation.

The hydraulic system adopts imported Italian brand products with excellent performance and minimal maintenance. The oil cylinder lifting power system, inclined plate, top, and small oil cylinder operation, can be adjusted smoothly. The height adjustment plate is a selected decorative plate and profile, with a long service life. Various qualified manufacturers of boarding bridges are welcome to inquire by phone and sincerely invite cooperation!

Operation degree: There are two types of operations that can be used to raise and lower the boarding bridge. One is a manual pump station which uses manual hydraulic lifting, which is labor-intensive and somewhat labor-intensive. Advantages: It can be operated and used in any situation. Two types of electric pump stations use electric hydraulic lifting and lowering which reduces labor intensity and saves labor. Disadvantage: Once the power is cut off, it will not be able to be used, but now there are both manual and electric boarding bridges that are more convenient to use.


Munich Lim AirportHydraulic boarding bridge mobile typeComparison of impeller width



Shake the handle to raise the boarding bridge to the height of the container.

On a moving steel structure slope, forklifts can also directly enter the interior of truck carriages for bulk loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

The hydraulic boarding bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods, and is our good helper. However, malfunctions during use are inevitable. What should we do when encountering a malfunction?

Quality management.Open the manual valve, and secure more than 90% of the lip plates at the bottom of the container.

The pressure on the axle will reduce the service life of the boarding axle.

The width of the boarding bridge also requires a certain width of its own. However, if the width is too small, it is not conducive to forklift loading and unloading of goods. If the width is too large, it can occupy a certain space, which is not necessary. So a reasonable width is necessary, usually the width of the electric hydraulic boarding bridge is 1800mm, 2000mm, and 2100mm. The width of the bridge is divided into internal width and total width. As we have already mentioned, the internal width is the width of the passage, and the total width mainly refers to the width of the guardrails on both sides plus the width of the passage. The total width can be ignored in use,Munich Lim AirportAxle Co., Ltd, but everyone still cares about the internal width, which is the width of the channel.


Munich Lim AirportHydraulic boarding bridge mobile typeComparison of impeller width



When it comes to fixed hydraulic boarding bridges, but also doubles the efficiency of loading and unloading operations, accelerates logistics speed, and achieves significant economic benefits. Hydraulic loading and unloading bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other transport vehicles can directly enter the truck for batch loading and unloading of goods, also known as loading and unloading platforms.

(4) For the connection parts of the mobile boarding bridge, careful inspection should be carried out to check for any looseness,Munich Lim AirportHydraulic boarding bridge factory, such as connecting bolts. If there are any, they should be tightened in a timely manner. In addition, for all connecting shafts, there should be split pins that are thick and sufficient.

Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction filter is blocked, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.

Munich Lim Airport.The pressure on the axle will reduce the service life of the boarding axle.

It is strictly prohibited to apply excessive pile loads around the foundation pit.

After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working the workbench should be lowered to a low position.