TastulEfficiency of power transformerCareful use needs to be implemented many times

announcer:hp122HP117294921 release time:2024-05-05 11:24:30

Causes of fire in power transformer

Equipped with a temperature controller, stop the cooling centrifugal fan, set up common problem alarm, overtemperature alarm and overtemperature tripping effect and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.

Tastul.Oil sample inspection & mdash; & mdash; the performance parameters such as compression resistance and residue shall be carried out every three years. The long-term overload or overload of the transformer can reduce the cycle time.

The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?

.Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

The vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore, it must also be changed to produce flexible connection.

Oil leakage of bolt or pipe external thread


TastulEfficiency of power transformerCareful use needs to be implemented many times



Operation of oil immersed transformer

The visual inspection method is that the staff use human eyes to observe the appearance change of the visible parts of the operating equipment to find the abnormal conditions of the equipment, such as discoloration, deformation offset, cracking, loosening, oil leakage, broken strand disconnection, short-circuit fault marks, hanging of dirty things etching and turbidity, which can be inspected according to the visual inspection method. Therefore,Tastul20 kV oil immersed transformer, visual inspection is one of the common methods of equipment inspection.

The noise of dry-type transformer comes from

details.The bearing capacity of each load is different. Generally, while oil transformer has better load working capacity.

The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.

In relay protection dry-type transformer, the disconnection of the fault point is related to each other. In a word, if there is any problem at a certain point, it will affect the whole power circuit


TastulEfficiency of power transformerCareful use needs to be implemented many times



Then clamp the branch pipe with your thumb, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube, carry out it twice, and then draw the oil sample.

Recommendation and consultation.Some are tied with plastic tape, and some immediately press the two edges together, because the socket can not be pressed firmly during installation,TastulTransformer and current, and there is still oil leakage without sealing effect.

The dry-type transformer used for power plant voltage transformation is different from the oil transformer. It is strictly prohibited to lead the way at the bottom voltage side to prevent the insulation layer of the dry-type transformer from penetrating due to overvoltage caused by overvoltage at the power grid side or lightning stroke on the line.

Dry type transformer factory

Tastul.Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management,TastulRecycling power transformer, which can control the oscillation below 0.2%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.

Power transformer factory

When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency: