MengzePower transformer test reportUnconventional

announcer:hp122HP117294921 release time:2024-05-06 11:18:26

When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:

Manufacturing process and steps of dry-type transformer

Mengze.How is the quality level of dry-type transformer compared with foreign countries?

The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety, otherwise it will have an adverse impact on life safety.

.Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.

In relay protection dry-type transformer, the disconnection of the fault point is related to each other. In a word, if there is any problem at a certain point it will affect the whole power circuit

If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear 4 round steel from top to bottom in the surrounding screw holes,MengzeParameters of 10kV distribution transformer,MengzeWhat is the allowable overload of dry-type transformer, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for 100mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body,MengzeMaximum temperature of oil immersed transformer, and rotate the crane to place the bell cover on the clean skid.


MengzePower transformer test reportUnconventional



Dry type transformer manufacturer

Hand touch method for transformer inspection

Then clamp the branch pipe with your thumb, clearly put forward the glass test tube, and then draw the oil sample.

Process inspection.Caused by sand holes and cracks. For crack leakage, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.


MengzePower transformer test reportUnconventional



When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.

The cheapest.Analysis of common faults of oil immersed transformer:

Right, as & ldquo; Great Lars car & rdquo;, After replacing one 255kva small transformer, the utilization rate is close, but the main parameters of the two transformers are evaluated as shown in Table 1. Table 1 evaluates the main parameters of the transformer: capacity (VA) iron loss (W) copper loss (W). Firstly, the output power is saved according to the customary calculation method (ignoring copper loss): the results show that the loss of large capacity transformer is lower than that of small capacity transformer, It actually consumes electromagnetic energy.

If the volume of power transformer is too small the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.

Mengze.The noise of dry-type transformer comes from

It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.

Noise pollution control and prevention measures of dry-type transformer