ButenboDirect transformerThe correct way to open

announcer:hp122HP117294921 release time:2024-04-20 14:33:57

If the oil immersed transformer is burned by the cover of the transformer when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard,ButenboBox transformer 630kVA price, the fire brigade must be notified.

When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.

Butenbo.Protection mode for type selection of dry-type test transformer

Insulation and heat removal are different. Dry type transformers are generally insulated with epoxy resin, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil, insulated by insulating oil in the circulating system inside the transformer, and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.

.Brief introduction of zero line of power transformer

When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.

Falling foreign matters and piercing


ButenboDirect transformerThe correct way to open



Before no-load impulse closing, the transformer shall be placed for 24h and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.

The transformer manufacturer said that the temperature display equipment: the temperature change value is measured according to the PT100 temperature sensor embedded in the bottom voltage winding to immediately indicate the winding temperature of each phase (three-phase safety inspection and Zui large value indication, the electronic computer can be equipped with an electronic computer socket, an intelligent transmitter, and 31 transformers can be detected. The over temperature alarm and trip of the system software can also be signaled by the resistor data of Pt100 thermistor sensor, so as to further improve the stability of the temperature maintenance system software.

Oil immersed transformer company

Promise and keep promise.Brief introduction of zero line of power transformer

The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, maintenance and transportation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.

Before no-load impulse closing, the transformer shall be placed for 24h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.


ButenboDirect transformerThe correct way to open



Power transformer

total cost.Operation and maintenance management of oil immersed transformer

The equipment can eliminate the shortcomings found in the patrol inspection, clean the porcelain waterproof casing casing, remove and replace the cracked or brittle leather pad,ButenboAll transformers, check and tighten the node,ButenboTransformer in distribution room, replenish the oil with less oil, check and replace the silica gel of the breathing mask, etc.

The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min, most of it is scattered according to the building structure. This kind of low-frequency noise is scattered to the household house according to the house building, which is then scattered to the ears of consumers. Although the amount of noise is not very large, the dispersion spacing and adverse effects are very large.

Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined, appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.

Fault judgment of power transformer