BukaTransformer 2000 KVAAnalysis of the reasons for the decline in production and sales

announcer:hp122HP117294921 release time:2024-04-20 09:47:10

Oil immersed transformer company

The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms, the closing shall be maintained by high-voltage arrester and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).

Buka.The equipment can eliminate the shortcomings found in the patrol inspection, clean the porcelain waterproof casing casing, remove and replace the cracked or brittle leather pad, check and tighten the node, replenish the oil with less oil, check and replace the silica gel of the breathing mask, etc.

& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger, the resistance value exceeds 2m ohm bus.

.Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.

Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, if the tap changer is not in time, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.


BukaTransformer 2000 KVAAnalysis of the reasons for the decline in production and sales



For the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents, power failure, damage to machinery and equipment, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.

When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change,Buka630 dry type power transformer, as in the case of the second phase. There are three reasons for phase deficiency:

Brief introduction of zero line of power transformer


BukaTransformer 2000 KVAAnalysis of the reasons for the decline in production and sales



Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod please connect all routes as far as possible to prevent other faults.

How much does it cost?.Brief introduction of zero line of power transformer

At that time, only a few companies in China could produce 500kV high-voltage transformers and the market share of high-voltage transformers was basically monopolized by overseas leaders.

Connection group structure of dry-type transformer

Buka.How much is the power transformer

The power transformer conductor refers to the connecting transmission line between each electromagnetic coil,BukaConstruction power transformer, between the electromagnetic coil and the group outlet pipe, and between the electromagnetic coil and the tap changer.

Power transformer factory