ParksHydraulic boarding bridge factoryHow to judge good or bad with eyes

announcer:hp161HP196399230 release time:2024-02-11 11:02:46

  1. Before use, check the boarding bridge for obvious damage such as cracks and broken wires.

During excavation, if unidentifiable items or unforeseeable situations are found, the operation should be stopped in a timely manner and reported to the person in charge of the hydraulic boarding bridge for handling. The fixed boarding bridge is an auxiliary equipment for loading and unloading in conjunction with the storage platform. This equipment is integrated with the platform and can be adjusted up or down according to the different heights of the truck carriage, making it convenient for forklifts to enter the carriage. The equipment adopts an imported hydraulic pump station with anti rolling skirts on both sides, making work safer and improving work efficiency.

Parks.When conducting high-altitude operations on dangerous edges such as roofs, suspension bridges, slopes, or cliffs, guardrails or safety nets should be installed on the side facing the air, and its height adjustment function can build a bridge between the truck and the warehouse platform. What are the operational steps we take during use?

.Check if the manual valve is open. When using,ParksBoarding bridge steel plate, it must be opened otherwise the boarding bridge may be damaged.

Reason for the lifting table not lowering: The lowering valve is malfunctioning, and the lowering speed valve is out of adjustment. Solution: When pressing the lowering button,ParksDesign of boarding bridge, check if the lowering valve is energized. If there is no electricity, try to eliminate it; If there is electricity, troubleshoot the lowering valve itself or replace the lowering valve. The lowering valve should be kept clean.

What is a hydraulic boarding axle? The hydraulic boarding bridge is a special auxiliary equipment used for fast loading and unloading of goods, and its height adjustment function can build a bridge between the truck and the warehouse platform. What are the operational steps we take during use?


ParksHydraulic boarding bridge factoryHow to judge good or bad with eyes



When confirming that the lip is fixed to the container, pull out the hook to hook it into the container, tighten the chain to ensure that it does not loosen, and press the brake blocks on both sides. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

Usage environment: Able to adapt to specific working environments, such as working in highly corrosive, dusty, high-temperature, and low-temperature environments.

During use, close attention should be paid to the condition of the equipment and if there are any problems, the use should be stopped immediately.

Trustworthy.Open planning before placement makes it easy to clean up clutter.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

The safety valve of the mobile hydraulic boarding bridge can also generate high noise. When air is mixed into hydraulic oil, the relief valve gets stuck or severely worn, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, we should regularly clean the safety valve, and replace it if it is damaged or severely worn.


ParksHydraulic boarding bridge factoryHow to judge good or bad with eyes



During the excavation process of the foundation pit of the simple boarding bridge,ParksFolding boarding bridge, collision of the support structure should be prevented and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, slowly lower the boarding bridge construction must be suspended and reported to the superior for handling.

offer.Open the manual valve, and secure more than 90% of the lip plates at the bottom of the container.

The natural frequency of the air spring is stable, so its performance is also stable, which means that the air spring is closer to the ideal state. How does the air spring change the air pressure in the airbag with different loads to achieve the goal of keeping the distance between the car body and the road surface unchanged. The height valve 3 shown serves this purpose. The height valve is fixed on the frame and the connecting rod is connected to the hydraulic boarding bridge. The height valve has two valves, the charging valve for air supply and the air release valve for air supply. These two valves are both connected by the rod. When the car load increases, the boarding bridge moves close to the frame, the connecting rod rises. When the connecting rod mechanism opens the charging valve, compressed air enters the air spring, and the frame and body rise until the height of the body is restored.

The width of the boarding bridge also requires a certain width of its own. However, if the width is too small, it is not conducive to forklift loading and unloading of goods. If the width is too large, it can occupy a certain space, which is not necessary. So a reasonable width is necessary, usually the width of the electric hydraulic boarding bridge is 1800mm, 2000mm, the internal width is the width of the passage, and the total width mainly refers to the width of the guardrails on both sides plus the width of the passage. The total width can be ignored in use, but everyone still cares about the internal width, which is the width of the channel.

Parks.The hydraulic system adopts imported Italian brand products, with excellent performance and minimal maintenance. The oil cylinder lifting power system, inclined plate, top, and small oil cylinder operation, can be adjusted smoothly. The height adjustment plate is a selected decorative plate and profile, with a long service life. Various qualified manufacturers of boarding bridges are welcome to inquire by phone and sincerely invite cooperation!

When working on the hydraulic boarding bridge, the support legs must be extended, and the support leg bolts must be adjusted to ensure that the lifting platform is stably stressed on the support legs and kept horizontal; During the lifting process and in the lifting state, the lifting platform must not be moved, and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use, it is necessary to perform no-load lifting and check whether the hydraulic system is normal; The load of the workbench should not exceed the rated value, and it should not be subjected to intense manual shaking; The hydraulic oil in the oil tank must be replaced every 500 hours of operation.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.