SacramentoInstallation of fresh-keeping cold storageWhich brand performs well

announcer:hp632HP195506591 release time:2022-01-09 10:04:53

At ordinary times, users should check the sealing degree of the gap of the cold storage, and notify the cold storage for maintenance in time if damaged parts are found.

When installing the polyurethane insulation board, the adhesion between the panel of the polyurethane insulation board and the thermal insulation material is short and often high.

Sacramento.No dirt shall be accumulated on the equipment of the fresh-keeping warehouse, otherwise the warehouse plate of the frozen warehouse will deform and endanger the thermal insulation characteristics, and keep the channels around the frozen warehouse unimpeded. Only by ensuring excellent heat removal and refrigeration can it be excellent. The place where the freezer is placed shall be kept dry, clean, free of inflammables and ensure that there is no risk of cutting. Objects shall not be stacked in front of the air conditioning evaporator to prevent endangering the actual effect of refrigeration.

The construction structure of structural cold storage can be brick concrete structure or steel structure, which can be determined according to their own budget and actual needs. At present, most cold storages are constructed with single-layer steel structure, unloading platform, refrigeration system, system, pipeline system, etc. according to the actual needs of cold storage circulation.

.These are several very common cold storage materials. The use of these materials has greatly improved the thermal insulation and refrigeration performance of the cold storage, which makes people's retained items more convenient and reliable. With the continuous development of material technology, and the cold storage is different from each other. When purchasing, we should make reasonable comparison and select products suitable for our own use needs and economic conditions.

Various construction materials, such as material certificate, test report and stage acceptance record, shall be carried out simultaneously with the project construction carefully, accurately and comprehensively reflect the whole process of production and construction, and actively cooperate with the owner in design change and technical negotiation.

Compression refrigerator is commonly used, which is mainly composed of compressor, condenser, throttle valve and evaporation pipe. According to the way of evaporation pipe device, it can be divided into direct cooling and indirect cooling. Direct cooling the evaporation pipe is installed in the refrigerated warehouse. When the liquid coolant passes through the evaporation pipe, it will directly absorb the heat in the warehouse and cool down.


SacramentoInstallation of fresh-keeping cold storageWhich brand performs well



During the use of the goods yard medical cold storage project, the stored goods must be in strict accordance with the relevant regulations. The goods should have a certain distance from the ground and wall of the cold storage. When stacking, the distance between the goods and the goods must be cm. At the same time, the distance between the goods and the cold fan should also be 100 cm. No goods can be stored within this range, This is also an important content in the use of medical cold storage engineering.

Ice cubes are always available in the cold storage. For small cold storage, the cost of using standby power supply or generator set is too high and the cost performance is low. In this case some ice cubes must be always available in the cold storage. In case of power failure or refrigeration equipment failure, the butt joint shall be filled with foaming material ice cubes can be used to maintain the temperature in the cold storage.

The butt joint between the top warehouse plate and the end of the top warehouse plate shall be treated to prevent air leakage and cold running. After all the top warehouse plates are installed, and the 80mm wide color steel plate shall be sealed at the butt joint with pull riveting.

How much is it.Compression refrigerator is commonly used. It is mainly composed of compressor, condenser, throttle valve and evaporation pipe. The evaporation pipe is installed in the refrigeration warehouse. When the liquid coolant passes through the evaporation pipe, the cold storage can be started for cold storage commissioning. According to the needs of customers, adjust the value of the cold storage, the cold storage can reach the predetermined temperature, the cooling speed and the operation of the cold storage are normal, and the cold storage can be delivered for use. The cold storage installation unit shall also provide the cold storage user with training on cold storage use and management knowledge, as well as some after-sales training.

Step of cold storage design: selection and laying of cold storage thermal insulation materials. The use of cold storage thermal insulation materials must be adjusted to the time, which not only has excellent fire resistance, but also has high cost performance. There are several types of cold storage insulation materials. One is the plate produced and processed into a fixed shape and specification, with fixed length, total width and thickness. The cold storage plate with relative specification and model can be selected according to the installation of the warehouse body. The high and medium temperature cold storage generally adopts 10cm thick cold storage plate, 12cm or 15cm thick cold storage board is generally used for ultra-low temperature cold storage and freeze-cleaning cold storage; Another kind of cold storage can be sprayed with polyurethane spray paint and polyurethane foam, and the raw materials can be sprayed into the brick or concrete warehouse of the cold storage to be built immediately. After shaping, it is both waterproof and thermal insulation. Thermal insulation materials include polyurethane, polystyrene grease, etc. Polyurethane is non hygroscopic and has good fire resistance, but the cost is low.


SacramentoInstallation of fresh-keeping cold storageWhich brand performs well



Disadvantages of multi-layer cold storage: the vertical transportation volume of the warehouse is large, and the goods in and out and operation management are not as convenient as single-layer cold storage; With the development of the floor load capacity, the floor area ratio of each cold room is low; When the multi-storey cold storage is built on the foundation with poor ground resistance, the foundation construction is complex. High cost; When prefabricated components are used, large construction equipment is required and the construction period is long.

Customer first.According to the size and nature of the cold storage area and in combination with local regulations, the construction form of food cold storage warehouse is to determine the plane layout based on the site, whether it is a single-layer or double-layer warehouse and the structure is the selection of steel structure or reinforcement solidification. Cold storage capacity, production process, refrigeration, product stacking, temperature, etc. are used to determine the size and location of the cold storage room, so that it can become a whole.

Condensation pressure if the condenser has poor heat transfer, the condensation pressure will increase and the cooling power will decrease. For cooling, power consumption increases. If the configuration of the cooling system is too small the heat transfer capacity will be insufficient, resulting in high condensation pressure.

Strong deformation resistance, not easy to crack smooth, stable and safe. Polyurethane material has stable porosity structure and basically closed pore structure. It not only has excellent thermal insulation performance, but also has good freeze-thaw resistance and sound absorption performance. Under normal service and maintenance conditions, the life expectancy of rigid foam polyurethane insulation can reach more than 30 years. During the structural life period, it can reach the unit price of dry, wet or electric corrosion under normal service conditions, while the unit price of insect, fungus or algae foam material is higher than other traditional insulation materials, but heating will increase the cost and the cooling cost will be greatly reduced.

Sacramento.With the increasing use of cold storage, cold storage board, as an important structure of cold storage, is also increasing. Because cold storage is different from other ordinary cold storage, it is important to the installation environment and temperature. Therefore, some small problems may be ignored during installation. According to the following understanding.

The product shade warehouse is a warehouse location below 20 ℃ and the sun cannot be straight. The humidity is 45% ~ 75% relative humidity, and there are corresponding strict requirements for the wall, ceiling, ventilation, disinfection and epidemic prevention of the warehouse. The refrigeration system adopts full-automatic microcomputer electrical technology and does not need to be on duty. It mainly stores western and Chinese grass materials and instruments, and can monitor and record the temperature and humidity in the storage area.

The installation of top warehouse plate should be carried out alternately with the installation of wall plate, and the wall plate should leave a gap for withdrawing construction equipment; During the installation of the top warehouse plate, the end steel sheet at the overlap with the wall plate shall be disconnected for 50mm to prevent the cold bridge from running cold; Two layers of foaming materials shall be evenly and continuously punched on the joint surface between each top warehouse plate. Rivets shall be pulled and fixed at the internal and external lap joints of the steel plate, and the rivet spacing shall be 300mm; According to the design drawings, if there are supporting beams, columns and supporting steel frames in the warehouse, the setting out and positioning shall be carried out and accurate and clear marks shall be made according to the requirements of the design drawings; Weld or install the support beam, column, etc., and the welded junction shall be moisture-proof and treated according to the drawing requirements.