PodgoricaDry type isolation transformer factoryWhat is the defect processing method

announcer:hp122HP117294921 release time:2023-12-07 09:05:04

The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, that is, the disconnection component of the electric field is small.

Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.

Podgorica.The fundamental reason for this kind of inaccuracy is that when the transformer & ldquo; Dalar trolley & rdquo; is considered according to the size of capacity utilization rate, the high-capacity transformer must be replaced by the small-capacity transformer with high utilization rate, and then the iron loss is considered and the copper loss is ignored. In fact, for a certain load, the active power loss of small capacity exceeds that of large capacity The active power loss of the transformer so it consumes electromagnetic energy.

(I) the distance between the external contour of 10kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than 1m; At the angle with actual operation, a spacing of more than 2m shall be reserved; If metal fence is selected,Podgorica380V to 660V three-phase transformer, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.

.When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.

The noise of dry-type transformer comes from

Noise dispersion of dry-type transformer


PodgoricaDry type isolation transformer factoryWhat is the defect processing method



In relay protection dry-type transformer, the disconnection of the fault point is related to each other. In a word, if there is any problem at a certain point, it will affect the whole power circuit

Step up process of dry-type transformer?

The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding,PodgoricaScb13-1250kva dry type transformer, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.

Standard requirements.(5) the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator, it shall be installed on both sides of the low-voltage composite insulator, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found the problem of dryness shall be solved. Generally, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N2 shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, and there shall be no dirt.

It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain, laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.


PodgoricaDry type isolation transformer factoryWhat is the defect processing method



Sound in case of phase failure

Meticulous workmanship.The power transformer conductor refers to the connecting transmission line between each electromagnetic coil,PodgoricaLandscape box transformer, between the electromagnetic coil and the group outlet pipe and between the electromagnetic coil and the tap changer.

The insulation between silicon steel sheets is damaged, resulting in overheating and melting of the iron core;

How to reduce the failure of dry-type transformer?

Podgorica.When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.

What is the wavelength of oil immersed transformer?

The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min, and the time interval of each closing shall not be less than 5min.