PisaGuide rail elevatorDrive industry development

announcer:hp695HP135175170 release time:2023-12-06 17:45:24

and most of them are part-time workers. Therefore, we are constantly researching mobile lifting platforms to meet different needs. However, for some large logistics or enterprise processing plants, we are still accustomed to using fixed elevators, He has a huge load capacity and strong stability, which can meet the needs of many customers, which is also the use of lifting platforms in China in recent years.

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).

Pisa.Many people believe that the mechanical strength of the elevator itself is relatively high when using it, so they did not strictly follow the installation method specified in the manual during the installation process. Little did they know that this would cause increased wear and tear of the parts and inflexible operation. In addition,PisaMobile hydraulic lifting platform/lifting platform,PisaHydraulic lifting platform, they should pay attention to the installation precautions corresponding to the working environment and not be careless. Proper installation, use, and maintenance of elevators are important steps to ensure the normal operation of mechanical equipment. Therefore, when installing the elevator, please be sure to strictly follow the installation and use related matters below, and carefully assemble and use it.

Every month, it should be ensured to add butter twice to the transmission position where the grease nipple is located. For areas where butter cannot be added, it is necessary to clear the oil circuit or replace the grease nipple until butter can be added. Otherwise, it is prohibited to use the equipment.

.Check the hydraulic oil quality and level. When the lifting platform is raised to a high position, the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part tighten the pipe joint.

Regular refueling is necessary for maintenance of the elevator: During the use of the elevator, due to the large load, there is also significant friction between various components, especially the elevator chain and elevator shaft pins. It is necessary to ensure that an appropriate amount of oil is added before each use to ensure flexibility and non jamming during operation. If the elevator is in operation and once&quo; appears; Squeak and Squeak&# quo; The friction sound can be basically determined to be due to a lack of oil in the elevator. It is necessary to immediately stop working and investigate the cause, and cannot forcibly operate, which can easily cause unforeseeable hidden dangers. Summary: Regular refueling is not allowed when maintaining the elevator.

Regular refueling is necessary for maintenance of the elevator: During the use of the elevator due to the large load, there is also significant friction between various components, especially the elevator chain and elevator shaft pins. It is necessary to ensure that an appropriate amount of oil is added before each use to ensure flexibility and non jamming during operation. If the elevator is in operation and once&quo; appears; Squeak and Squeak&# quo; The friction sound can be basically determined to be due to a lack of oil in the elevator. It is necessary to immediately stop working and investigate the cause, and cannot forcibly operate, which can easily cause unforeseeable hidden dangers. Summary: Regular refueling is not allowed when maintaining the elevator.


PisaGuide rail elevatorDrive industry development



In our daily life,PisaHydraulic lifting platform fixed type, hydraulic cargo elevators are increasingly widely used and loved by customers. As a lifting tool, the editor will introduce the daily maintenance of hydraulic cargo elevators.

Check the circuit breaker and motor wiring. Long term manufacturer of scissor fork lifts, a 20 year old brand with competitive prices and guaranteed quality!

Elevators are now very popular among people and can easily transport goods to high-rise buildings. Among them, hydraulic elevators are more popular among people, and people can choose the one that suits them according to their actual situation. However, during normal work, it is important to pay attention to the lifting speed of hydraulic elevators and avoid making mistakes. So what factors will affect the lifting speed of hydraulic elevators?

Packaging strategy.Guide rail type cargo elevators are a type of equipment for transporting heavy objects up and down, workshops, its daily maintenance and upkeep are very important, because some small details can have a significant impact on the operation safety of the equipment if not paid attention to. Therefore, but it is also important to pay attention to some details, such as: it is actually difficult to thrust bearings into the shaft pins when excessively installing them. However, sometimes, some people may think of using a hammer to hammer the bearings for convenience, and use brute force during installation. In fact, directly hitting the bearings with a hammer can cause significant damage to the bearings, which is the main reason for bearing damage and reducing the service life of the bearings. So when installing bearings, we must not go too far. Fortunately, we can place some soft cloth or cardboard on top of them before installing them.

The reduction gearbox, gearbox, external meshing gear and other parts, as well as the hydraulic oil, are all carried out according to the requirements in the table. Professional scissor lift manufacturer with high prices, service, on-site settlement, and honest operation!


PisaGuide rail elevatorDrive industry development



When installing, disassembling, and adjusting the rotating mechanism, it is important to ensure that the centerline of the reducer of the rotating mechanism is parallel to the centerline of the gear, and its meshing surface is not less than 70%. The meshing clearance should be suitable.

market.During use, the elevator should be placed on a solid and flat ground to prevent tipping during operation. Press&quo; Rising; Or&quo; Descending; Press the button to frequently check and maintain the various components of the elevator when lifting the workbench. If the workbench does not move, it should be immediately stopped for inspection. When the working pressure of the electric elevator is found to be too high or the sound is abnormal, it should be immediately shut down for inspection to avoid serious mechanical damage; Regularly check the working status of the shaft pin every month. If any loose shaft pin or screw is found it must be locked tightly to prevent accidents caused by the shaft pin falling off.

Having a high social status, it has now become an irreplaceable part of our mainstream goods. And the hydraulic pump station is the heart position of the lifting machinery which extremely tests the professionalism and attention of the operator. It is our common responsibility to inspect it and ensure the daily use of machinery. Let's take a look at several common sense issues: the elevator manufacturer's point is to ensure the correctness of the power connection, and there should be no misconnection or leakage; Pay attention to cleaning work in daily life and do not allow stains to corrode it; When standing still, regular maintenance should be carried out to prevent the impact of rain and snow weather; Overloading is the first thing that operators must comply with; Iron Law&# quo;; The adjustment of the solenoid valve cannot be done arbitrarily and must be checked and certified by a professional organization; Especially when conducting outdoor operations under high temperatures, it is necessary to always pay attention to the abnormalities of the pump station; It is very normal for us to encounter some problems when using hydraulic boarding bridges, as long as these problems are not very serious, we don't have to worry too much. However, when there is a problem with the hydraulic boarding bridge only a timely solution is the correct response. Below is an introduction to some common faults of the hydraulic boarding bridge and specific solutions: the hydraulic boarding bridge must be repaired while hanging and supporting the working platform of the lifting platform to avoid sudden descent of the lifting platform, causing unnecessary casualties; 2. Do not adjust the overflow valve arbitrarily. Because every component in the hydraulic system operates at a specified pressure, once the relief valve is adjusted, it may cause abnormal operation of the hydraulic system, causing unnecessary damage to people, machines, and objects; Non professional personnel are not allowed to disassemble electrical appliances at will to prevent electric shock or incorrect connection.

The correct construction inspection of the airport is to first inspect the foundation to see if there is any water accumulation and to see if the grounding system meets the requirements. We also need to see how the structural bolts of this frame are tightened, and whether there are any cracks in the welds. We need to set them according to the instructions. In mechanical transmission, it can be divided into two types: open type and closed type. Of course, there are also many safety equipment for elevators.

Pisa.Each department's electric brush should be kept clean, and the brush pressure should be adjusted to ensure that its area is not less than 50%

Regularly check the connection of each part of the hydraulic elevator, and tighten it if there is any looseness. The tightness of the body connecting bolts should be checked when the body is under pressure, and all connecting shafts must have split pins and be sufficient.

Remove and disassemble the lowering valve, blow the valve core clean with compressed air, and then reinstall it.