VladingenLifting platform hydraulic pressureGood erosion resistance

announcer:hp695HP135175170 release time:2024-02-12 14:52:07

According to Beijing regulations, the arrival time is within 30 minutes.

Avoid, especially during storage. Store in a cool and dry place, and avoid rainy and snowy weather during work.

Vladingen.Hydraulic pump station: domestic lifting platform dedicated pump station, Italian imported pump station with external protective devices: organ m type, mesh type, and iron plate sealed type.

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).

.Familiarity with the usage process and without a doubt, this is the first thing to understand. There are two ways to understand it: first, carefully read the user manual provided by the manufacturer when the hydraulic lifting platform leaves the factory; The second is the equipment that needs to be installed. A professional installation technician will be dispatched to install the hydraulic lifting platform. After the installation is completed, relevant users will be trained on the operating process and safety precautions of the hydraulic lifting platform, and some maintenance matters in the future will also be explained; What should be paid attention to during the running-in period when using hydraulic lifting platforms? Check the wear of components. For newly processed and assembled components, there may be subtle deviations in shape and size that require a period of time for running-in. Therefore, during the running-in period, it is necessary to pay attention to whether there is any rapid wear. If there is any, and add some engine oil or grease appropriately; Confirm if there is any noise during the running-in period. If it is found that the hydraulic lifting platform is noisy during operation, there is no need to worry in the early stage. If there are no major problems, run it several times more. After the running-in, the noise will naturally disappear. However, if there is noise for a long time and no signs of fading, please make sure to promptly produce it and solve the problem; Regularly check if the components are loose. Before use, check if there are any signs of looseness in screws, nuts, retaining rings, oil pipe joints, etc. If there are any, please reinforce or replace them in a timely manner to avoid accidents.

High altitude work requires the use of tool bags, and heavier and larger high-altitude work tools should be hung on stable components and cannot be placed randomly to avoid the occurrence of high-altitude falling accidents.

Do not adjust the solenoid valve on the motor arbitrarily. The solenoid valve is pre adjusted before leaving the factory and random adjustment can easily cause internal pressure to increase or decrease. In severe cases, it can shorten the service life of the motor.


VladingenLifting platform hydraulic pressureGood erosion resistance



Remove and disassemble the hydraulic lift cargo elevator lowering valve, blow out the plunger with compressed air, then install it and reinstall it.

How should we extend the service life of hydraulic lifting platforms? In order to prolong the service life of such machinery and equipment, it is necessary to regularly inspect and maintain the equipment during use. For example, if there are various switch devices inside the machinery and equipment, it is necessary to regularly check whether these switches can be used normally and whether the switch points are in good condition during use. There will be an electrical box and distribution box inside the elevator, and these devices are prone to dust accumulation outside. If the dust accumulates too much it may cause rust on the outside of the electrical box. Therefore, when using them, it is necessary to regularly remove the dust on the outside of various boxes. Generally, this job is what operators should do after each operation.

Each box, distribution box, and dust on electrical equipment should be quickly swept away.

Service first.What are the maintenance rules for the mechanical equipment of hydraulic elevators? The brakes of each mechanism should be regularly inspected and adjusted to ensure flexibility and reliability. On the friction surface, there should be no dirt present, and any dirt must be washed off with gasoline or thinner.

Hydraulic oil should be kept clean and replaced every 6 months; When repairing maintaining, and cleaning the elevator, safety nets or safety belts must be used. Specializing in the production of scissor type elevators, a 20 year old brand with competitive prices and guaranteed quality!


VladingenLifting platform hydraulic pressureGood erosion resistance



When installing, disassembling, and adjusting the rotating mechanism, it is important to ensure that the centerline of the reducer of the rotating mechanism is parallel to the centerline of the gear, and its meshing surface is not less than 70%. The meshing clearance should be suitable.

Fair price.After entering winter, elevators are prone to some small problems and malfunctions,VladingenHydraulic aluminum alloy lifting platform, which requires users to perform seasonal maintenance and upkeep on the elevator. Below, the editor will briefly introduce the winter maintenance precautions and key points of the elevator.

Dirty normally closed valve; The solution is to remove the normally closed valve and use cleaning agent or cleaning. Long term scissor fork lift manufacturers have a complete range of products, excellent quality, and discounted prices

The daily maintenance of guide rail type lifting equipment should pay attention to regular inspection and maintenance eliminate hidden dangers,VladingenPrice of hydraulic platform lift truck, eliminate faults, and achieve these benefits for improving work efficiency, extending equipment service life, and ensuring the safety performance of the elevator.

Vladingen.High altitude work requires the use of tool bags, and heavier and larger high-altitude work tools should be hung on stable components and cannot be placed randomly to avoid the occurrence of high-altitude falling accidents.

The daily maintenance of guide rail type cargo elevators should ensure that the transmission position where the grease nipple is located needs to be lubricated twice a month. For areas where grease cannot be added,Vladingen5 ton hydraulic lifting platform, it is necessary to clear the oil circuit or replace the grease nipple until butter can be added. Otherwise, it is prohibited to use the equipment.

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).