20 # thick wall welded pipeLaid a foundation for the development of heavy industry enterprises

announcer:hp709HP180518493 release time:2021-12-06 12:04:51

It is to preheat rather than increase the line energy. Reel needs quality, honest business! Let's talk about our productivity.

The inspection requirements for thick wall coiled pipe treatment are that the thick wall coiled pipe is made of steel plate. The thick wall coiled pipe can be divided into coiled pipe and hot rolled thick wall coiled pipe. Generally, the production process of thick wall coiled pipe can be divided into cold drawing and hot rolling. The production process of cold-rolled seamless steel pipe is generally more complex than hot rolling. Roll sizing test shall be carried out for the pipe blank first. If the surface does not respond to the crack, the round pipe shall be cut by a cutter and cut into a blank with a length of about meters. However, when entering the annealing process, acid shall be used for annealing, and attention shall be paid to whether a large number of bubbles are generated on the surface. If a large number of bubbles are generated,Q235B large diameter thick wall coiled pipe, it indicates that the quality of steel pipe can not meet the response standard. In appearance, the cold-rolled seamless steel pipe is shorter than the hot-rolled seamless steel pipe, and its wall thickness is generally smaller than that of the hot-rolled seamless steel pipe, but the surface is brighter than that of the thick wall seamless steel pipe. There is not too much roughness on the surface, and there are not too many burrs in the diameter. The thick wall coiled pipe is a powerful manufacturer quotation, honest operation, genuine and of the same quality. The thick wall coiled pipe is available from stock, with complete specifications, welded, formed, butted, removed and reinforced directly from the steel plate. Coil processing time is short and delivery is fast.

.The utility model is characterized in that a T-shaped welded steel pipe needs to be hung when measuring the length. In addition, the photoelectric switch detection also has a certain error, which may require a comprehensive measurement of the circumferential weld butt steel pipe.

The distance between the two longitudinal slits of the reel group shall be greater than 100mm. The outer wall of the branch pipe shall be longitudinal, and the circumferential weld shall not be less than 50mm.

.Have we learned about the packaging process of the steel used? Today, let's discuss the packaging process of lower thick wall coil.

Recently, with the rapid development of excellent strip continuous rolling production and the progress of welding and inspection technology the weld quality has been continuously improved, so as to gradually replace the seamless steel pipe. The main one is the technological development of welded pipe. Our welded pipe is made of steel plate or strip steel and welded after crimping. It is generally a welding process and the application field is relatively wide, which improves the production efficiency and service quality of welded pipe.

1800mm steel pipe elbow detailed introduction to elbow: first of all, the material is hot pushed, the pusher is a horn shaped core or mandrel the mandrel is thickened and thickened, and it is supported on the back. The material tube part passes through the mandrel, and there is an arched frame at the rear to fix the mandrel. There's a car in the middle. Some cars are driven hydraulically, others are driven by mechanical transmission, that is, screw drive, and then the car pushes forward, and the car pushes the pipeline along the core. The rod moves forward, there is an induction coil outside the mandrel, the tube is heated and heated, and then the trolley pushes the tube down and processes one.


20 # thick wall welded pipeLaid a foundation for the development of heavy industry enterprises



: 90% of the developed thick wall coil processing industry is CNC cutting machine, and only 10% is manual cutting; The CNC cutting machine only accounts for part of the total blanking. 10%, of which the proportion of NC plasma cutting is small. In industrial production, the thermal cutting of thick wall coiled pipe generally includes gas cutting, plasma cutting, laser cutting and so on. Among them, plasma cutting has a wider cutting range than gas cutting More efficient. Fine plasma cutting technology is close to laser cutting in material cutting surface quality, but the cost is much lower than laser cutting. Therefore, since the successful development of the United States in the mid-1950s, plasma cutting has developed rapidly. Professional hot-rolled steel pipe, large-diameter thick wall rolling pipe, thick wall straight seam rolling pipe, steel casing, rolling pipe factory, high pressure rating, good waterproof performance, fire and high temperature resistance, strong overload capacity, corrosion resistance, radiation protection and long service life. With the rapid development of computer and digital technology, which has become one of the main directions of NC cutting technology. NC plasma cutting technology is a set of high-tech technologies such as NC technology, plasma arc characteristic research, power electronics and other disciplines. The CNC cutting technology began in the 1980s, and the CNC plasma cutting technology was later. However, recently, narrowing the gap of foreign advanced technology. The large-scale rolling pipe factory of rolling pipe, t-welded rolling pipe, flaw detection welding rolling pipe, 16Mn rolling pipe, Q345B rolling pipe and special-shaped rolling pipe, and the t-welded rolling pipe, 16Mn rolling pipe, Q345B rolling pipe and special-shaped rolling pipe produced by the rolling pipe factory are exported to major engineering buildings at home and abroad.

Before forming, the strip steel is leveled, trimmed, planed,Q345B reel, surface cleaned, transported and pre bent.

Be able to show important value in different industries and fields. When the coiled pipe is greater than 600mm, two longitudinal welds are allowed, and the spacing shall be greater than 200mm.

Direct material.Hot rolled steel pipe is a kind of thick wall steel pipe rolled under the condition of heating the steel plate.

The pipeline installation sequence shall be adopted according to the principle of zoning and subsystem. First the lower level, then the upper level, and then the difficulty. In principle, the pipes connected to the machine are arranged from inside to outside to reduce the impact of welding stress on the installation accuracy of the machine. The joints of indoor and outdoor pipes shall be left outdoors. Q345B thick wall continuous pipe is a widely used carbon steel material. Q345B thick wall continuous pipe with thickness greater than 10mm is widely used in drainage engineering, sewage pipeline,45# large diameter thick wall coiled pipe, dredging pipeline, construction pipeline, etc. Q345B thick wall continuous pipe is a welded steel pipe product with relatively simple and flexible process. This kind of steel pipe is usually not in stock and is customized. If the quantity is small, the raw materials are not good. The main problem of Q345B thick wall continuous pipe is welding. As long as possible, delivery related requirements can be compared with other products.

Weight per meter of steel plate coil = (outer diameter wall thickness) * wall thickness * 0.0246615 steel plate coil is made of steel plate. Thick wall t-welded coil can be divided into coil and hot rolled thick wall coil.


20 # thick wall welded pipeLaid a foundation for the development of heavy industry enterprises



The distance between the two longitudinal slits of the reel group shall be greater than 100mm. The outer wall of the branch pipe shall be longitudinal, and the circumferential weld shall not be less than 50mm.

Work courses.Welding voltage because the welding arc is conical, and the welding voltage directly affects the length of the arc. Therefore the general production process of thick wall continuous pipe can be divided into cold drawing and hot rolling. The production process of cold rolled seamless steel pipe is generally more complex than that of hot rolled steel pipe. First, the round pipe will be cut and the growth of the blank is about M. However, during annealing, acid should be used for annealing, and attention should be paid to whether there are a large number of bubbles on the surface. If a large number of bubbles appear, the quality of the steel pipe will not meet the response standard. The appearance of cold-rolled seamless steel pipe is shorter than that of hot-rolled seamless steel pipe and the wall thickness is generally smaller than that of hot-rolled seamless steel pipe, but the surface is brighter than that of thick wall seamless steel pipe, the surface is not too rough, the diameter is not too prickly, and the strength is high. The manufacturer offers, operates in good faith, and has a real price. The same specification, thick wall continuous pipe, spot supply, and complete specifications, the arc length increases, the moving range of solder joint increases and the molten pool widens. If welding is carried out in a horizontal position, the weld width will be changed, but the edge transition of the weld will not be affected. However, the external welding of spiral welded pipe is carried out on the slope, and the molten weld metal will flow laterally under the action of gravity. We specialize in providing hot-rolled steel pipe, large-diameter thick wall continuous pipe, thick wall straight seam continuous pipe, steel casing and quality assurance of pipe rolling plant. During the preferential activities, new and old customers are welcome to consult. Therefore, the greater the welding voltage, the wider the weld pool, the more serious the transverse flow of weld metal, and finally lead to the bias of weld metal.

A series of water conservancy projects such as sand discharge, mud transportation, dredging and hydraulic reclamation. It is generally believed in the dredging industry that spiral pipe is the Zui best pipe for long-distance water conveyance and solid-liquid mixed transportation projects. The sand and mud discharge pipeline products produced by Hebei Xinghao pipeline industry have been used by hundreds of customers in China. Flange welded spiral steel pipe is widely used in long-distance water supply and drainage in various environments and exported to Japan. The connection is completed by adding flange gasket and fastening it with bolts. Some pipe fittings and equipment have their own flanges which also belong to flange connection.

The offer is in progress. Welcome new and old customers to consult. Prevent surface damage of steel plate. Thick wall coil and large diameter coil are mainly made of carbon steel, Q19 q23 q34 16Mn, etc. coil is a kind of welded pipe product with simple and flexible process. If the length required by the customer is special, two or more steel pipes must be connected. Therefore, the process of this welded pipe is flexible, convenient and applicable. The disadvantage is that it can not be produced by mechanized line. The level of automation and mechanization is not high, which requires a lot of manual processing. The main problem of coiled pipes is welding. Thick wall coiled pipes can be delivered as long as they can be inspected by flaw detection. The relevant requirements are broader than other products.

.Gas and other projects.

The function of parameters of pipe rolling equipment is improved by 30%, which fills the gap that can not be produced by traditional steel rolling equipment. It can produce steel pipes with diameter of more than 400 and wall thickness of 4-100mm. The main materials are q23q3420, 435cimo and 42cimo, 16 manganese and 16 manganese capacity. Generally speaking, cold-rolled sheet can be used for pipe rolling. Product standards: GB / t50205-200, GB / t3092-2001, etc.

The inspection requirements for thick wall coiled pipe treatment are that the thick wall coiled pipe is made of steel plate. The thick wall coiled pipe can be divided into coiled pipe and hot rolled thick wall coiled pipe. Generally, the production process of thick wall coiled pipe can be divided into cold drawing and hot rolling. The production process of cold-rolled seamless steel pipe is generally more complex than hot rolling. Roll sizing test shall be carried out for the pipe blank first. If the surface does not respond to the crack the round pipe shall be cut by a cutter and cut into a blank with a length of about meters. However, when entering the annealing process, acid shall be used for annealing, and attention shall be paid to whether a large number of bubbles are generated on the surface. If a large number of bubbles are generated, it indicates that the quality of steel pipe can not meet the response standard. In appearance, the cold-rolled seamless steel pipe is shorter than the hot-rolled seamless steel pipe, and its wall thickness is generally smaller than that of the hot-rolled seamless steel pipe, but the surface is brighter than that of the thick wall seamless steel pipe. There is not too much roughness on the surface, and there are not too many burrs in the diameter. The thick wall coiled pipe is a powerful manufacturer, quotation, honest operation, genuine and of the same quality. The thick wall coiled pipe is available from stock, with complete specifications,. The wall thickness of coiled pipe is 20mm and the outer diameter is 450-3000mm. It is rolled, welded, formed, butted, removed and reinforced directly from the steel plate. Coil processing time is short and delivery is fast.