IrvingGuide rail electric elevatorSummary of the investigation of the condition

announcer:hp935HP175192871 release time:2023-12-10 12:36:06

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, hydraulic control one-way valve, throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.

Irving.Try to use this equipment in areas with wind force less than level five, and avoid using it when the wind force is too strong to avoid accidents.

Manual pump: When the system malfunctions the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

.Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.

The scaffolding of the parking platform should be laid tightly and firmly.

Implementing multiple shifts of homework should fill in and submit records according to regulations.


IrvingGuide rail electric elevatorSummary of the investigation of the condition



Before installation,Irving2 meter high electric elevator, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

Setting requirements: Steel wire rope electric elevators and reusable steel wire ropes should be equipped with anti loosening rope devices, which should have compliant loosening rope switches and be able to interrupt any movement of the cage until it passes through the

Then the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.

Quotation sheet.When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.


IrvingGuide rail electric elevatorSummary of the investigation of the condition



Construction electric elevators outside the lightning protection range

Highly recommended.Implementing multiple shifts of homework should fill in and submit records according to regulations.

Degrees,IrvingBackground axis electric elevator, occupying a relatively small area, improving the utilization rate of the wellbore area.

Irving.With the continuous improvement of urbanization level in China,IrvingRechargeable electric elevator, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.

The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.