MedaniBox type transformer 400kVTalk about the technical issues of installation and maintenance

announcer:hp122HP117294921 release time:2024-05-01 14:57:47

The oil in the machinery and equipment of the oil storage tank shall generally stand for more than 8h before sampling; it is not necessary to stand when sampling on the running power transformer.

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut) wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.

Medani.After the power transformer has been used for a long time, common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:

When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, and each module is replaced by an equivalent circuit, and its power circuit includes an inductance and vertical capacitance, a capacitance to ground or capacitance between windings, They also have mutual inductors between the inductors of each module, and collect the chain Internet as the equivalent power circuit of oil immersed transformer. The precision of the conclusion can completely meet the needs of practical projects.

.After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary,MedaniDry type transformer scb10-100, the human resources traction belt shall be used as a guide.

When oil samples are used, the transformer was disconnected by vibration (but there was no grounding device).

The appropriate power saving calculation formula should be derived from the following process: active power loss of large capacity transformer: load of large capacity transformer; PDK - short-circuit fault loss of large capacity transformer, kW. Active power loss of small capacity transformer: when a pump room is in normal operation, two pumps are started separately, and each pump is driven by 100kW motor, so the usual load is 200 KW, CST = 0. One 750kva transformer was originally configured, and the capacity utilization rate introduced by the transformer manufacturer is only 34%

Oil leakage at looper flange

Development Curriculum.Oil leakage of porcelain pot and laminated glass oil level gauge

The power transformer conductor refers to the connecting transmission line between each electromagnetic coil, between the electromagnetic coil and the group outlet pipe, and between the electromagnetic coil and the tap changer.

Dry type transformer company


MedaniBox type transformer 400kVTalk about the technical issues of installation and maintenance



What is the wavelength of oil immersed transformer?

Latest consultation.The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer,Medani4000kva power transformer, the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min, and the time interval of each closing shall not be less than 5min.

In order to better avoid overvoltage damage, a group of overvoltage maintenance high-voltage Arresters (such as y4cs active zinc oxide high-voltage arresters) shall be refitted at the working voltage bus duct side of dry-type transformer.

Oil leakage of porcelain pot and laminated glass oil level gauge

Medani.(5) the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side,MedaniDry type power transformer 1250kva, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.

Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.