Costa Rica48lead small conduitSteps of enterprise merger and reorganization

announcer:hp965HP113924865 release time:2023-09-09 14:25:04

Injecting grout into the embedded grouting pipe can seal construction joints, cold joints, pipe leakage and joints between the ground walls.

When there are no special requirements in the design, the non prestressed members shall not be less than 50% of the designed standard value of concrete cube compressive strength, and the prestressed members shall not be less than 75% of the designed standard value of concrete cube compressive strength.

Costa Rica.Disposal method: the grouting pipe shall be shortened according to the specification.

Inverted formwork shall be used to install stairs and side formwork of components to increase the turnover rate of formwork. According to the design size, the formwork shall be cut with plate shears, edge folding machines, profile training machines, etc. the blanking standards shall be used for rebar concealment and cross slab. The unqualified ones shall be rectified until they meet the construction technology. Concrete pouring Before concrete mixing, the moisture content of sand and stone shall be measured and the construction mix proportion shall be adjusted according to the test results.

.The so-called direct grouting method refers to the method of directly placing the grouting pipe into the soil by vibrating or drilling. According to the different forms of grouting pipes, the direct grouting method can be divided into the grouting pipe grouting method, the flower pipe grouting method, the drill pipe grouting method, and the stop plug grouting method.Grouting pipe grouting method refers to the method of grouting directly through the nozzle at the lower part of the grouting pipe; The flower tube grouting method is a method of grouting through a grouting tube (flower tube) with multiple grouting holes on the side wall; The drill pipe grouting method refers to the method of grouting directly through the drill pipe for drilling.

Advantages of disposable grouting pipe: simple installation, complete set. No special installation equipment is required, and the cut-off length can be prepared on the construction site according to the actual requirements of the joint (the longest grouting pipe length is recommended not to exceed 6m), and the grouting time can be arbitrarily selected.

Inverted formwork shall be used to install stairs and side formwork of components to increase the turnover rate of formwork. According to the design size, the formwork shall be cut with plate shears, edge folding machines, profile training machines, etc. the blanking standards shall be used for rebar concealment and cross slab. The unqualified ones shall be rectified until they meet the construction technology. Concrete pouring Before concrete mixing, the moisture content of sand and stone shall be measured and the construction mix proportion shall be adjusted according to the test results.


Costa Rica48lead small conduitSteps of enterprise merger and reorganization



Construction Engineering Investigate the characteristics of surrounding rock, clarify the purpose of grouting, and determine the grouting range of surrounding rock.

The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - 5% ~ + 10%. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C40. Before grouting, the duct shall be wet and clean, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to 0.5-0.6mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than 30mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s,Costa RicaTunnel leading small conduit and pipe shed, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile.

[0019] a flange I and a bearing 8 are provided on the outer surface of the cutting rotating device The fast cutting device in the hole is installed in the grouting pipe hole through the flange. The fixed cutting device 2 is mainly composed of a cutting blade and a pulley. The expansion and contraction diameter of the blade is adjusted by the bolts at the tail of the rotating flange to cut the grouting pipe. The rotating blade and the pulley are connected to the rotating device through slots.[0020] the outer diameter of the cutting rotary device 5 is 2mm smaller than the inner diameter of the grouting pipe, so that the device can smoothly extend into the grouting pipe for cutting.

Good quality.Advantages of grouting pipe grouting pipe is an embedded grouting pipe system, which is used for permanent sealing of construction joints, cold joints pipe seepage joints, and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water penetrates into the joint, it can be sealed by injecting slurry into the PVC port set on the surface. The proper grouting time can be selected after the concrete curing. Leakage joints can also be permanently sealed in this way.

Full section slurry discharge (4 slurry discharge holes) is uniform and smooth.

Compared with the sleeve valve pipe grouting method, the common disadvantages of the grouting pipe grouting method, the flower pipe grouting method and the drill pipe grouting method are that the grouting is easy to overflow along the pipe wall and the grouting layering effect is poor. These disadvantages are particularly prominent when using the slurry with good fluidity and long initial setting time; Its advantages are simple equipment and process,Costa RicaAdvance support small conduit, good flexibility, fast construction speed, and more suitable for situations requiring rapid response.


Costa Rica48lead small conduitSteps of enterprise merger and reorganization



The comparison between the embedded detection and the on-site detection of the grouting pipe is yzed as follows: The embedded detection pipe: The pile diameter of 0.6 ~ 0.8m should be buried with double pipes; Three pipes shall be buried with pile diameter of 0.8 ~ 0m; Four pipes shall be buried above the pile diameter of 0m. According to the specific situation of Chifeng bridge, three pipes can be buried in the pile foundation.

middleman.Construction sequence: remove the cement residue and attached floating soil on the foundation surface. Use vise to cut it pipe with proper length, and each loop is 4m according to the paper requirements. Put the outer layer of fabric into the blue horn interface to try the tensile property and confirm that it has been inserted to the end. The other end of the horn is sleeved with a PVC reinforced grouting pipe. It pipes shall be arranged according to the direction of construction joints, and ensure that the PVC pipe is exposed outside the concrete for grouting in the future. Cement nail fixing clips or iron wires shall be used for fixing every other distance, and the distance between two fixing points shall be ≤ 30cm. The ends of it pipes of two adjacent circuits must overlap by at least 10cm. The exposed PVC pipe is installed in the grouting interface box to facilitate grouting in the future.

Among the many imported projects, the development of the production technology of automobile door and window sealing strips is the most representative. Through the introduction of sealing strip production lines from Japan, Germany, Italy, Britain and other countries, up to now, domestic manufacturers have introduced more than 60 sealing strip production lines. In addition to pure rubber sealing strips, sealing strips of various composite structures, metal skeleton and various rubber composite sealing strips, rubber and plastic composite sealing strips can be produced. At present, the overall level of China's sealing strip production technology has basically reached the level of foreign countries in the 1990s, and has become a grouting pipe. Because some projects are not easy to detect when they are manufactured, and the quality of the grouting pipe as a channel for testing instruments has become crucial. If the quality of the grouting pipe is poor, it will bring many hidden dangers. Steel grouting pipe material, which has the characteristics of thin pipe wall, steel saving, impermeability, pressure resistance and high strength, is generally used for post tensioned reserved holes in prestressed structures. When the grouting pipe is used, it can be directly bound to the reinforcement framework. Because the grouting pipe is very light, it is very convenient to operate. However,Costa RicaGrouting pipe grouting, attention should be paid to the balance of its axis during installation.

The grout stop plug used in the grout stop plug grouting method is the key device to seal the grouting borehole and realize segmented grouting. A good grout stop plug should ensure normal operation under the grouting pressure of more than 10MPa. According to its structure and working principle, the currently used slurry stoppers can be divided into two types: mechanical type and hydraulic expansion type. Among them, mechanical slurry stoppers are relatively simple and reliable, and are widely used. 21-5 is one of several commonly used slurry stoppers.

Costa Rica.Construction Engineering Investigate the characteristics of surrounding rock, clarify the purpose of grouting and determine the grouting range of surrounding rock.

[0009] the beneficial effects of the utility model are as follows: the utility model is set in the grouting pipe, reduces the operation intensity of workers by using the lead screw principle, which can greatly reduce the labor intensity of workers.

Determination of rock permeability: determine the specific position, angle depth, number of grouting rows, horizontal distance and vertical distance of grouting.