Operation and maintenance management of oil immersed transformer

During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.

Zhangui Nora.The domestic transformer market is slow

The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.

.(IV) the transformer on the column shall be stable and firm, and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.

When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.

Performance and main parameters of common metal composites, various welding processes and machinery and equipment, preparation treatment of thick steel plate, blanking process,Zhangui Nora16 kV Transformer, production and manufacturing process and quality standards of automobile oil tank, coupling and oil storage tank cabinet, welding leakage test and NDT technology, surface treatment process and quality standards, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes machinery and equipment of each process flow; The natural working environment is basically regulated.


Zhangui NoraTelephone number of dry-type transformer manufacturerRetail news today



The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ 4Ω, when the insulating layer is damaged According to Ohm's law, the current is only 1 / 500 of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.

The common dry-type transformer is an important electrical equipment, and the voltage is constantly regulated. However, because of certain necessity, the dry-type transformer will also boost voltage, and the whole process of boosting voltage is very complex, and there are many principles.

Connection group structure of dry-type transformer

how.Dry type transformer factory

The method and whole process of taking oil sample of power transformer are as follows:

Dry type transformer manufacturer


Zhangui NoraTelephone number of dry-type transformer manufacturerRetail news today



The main reason is that the welding quality of electric welding is poor, there are empty welding, open welding, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.

Application process.In specific daily life, we have a certain understanding of the optical wavelength of oil immersed transformer. What kind of function does it have for transformer?

The rate of transformer is: n = P2 / p1x1o%, that is,Zhangui NoraHigh voltage distribution transformer, when the copper loss of transformer is equivalent to iron loss, the rate is very large. Therefore, the load of transformer is: 0 = P / PK. Fully consider the active power loss caused by reactive power in the system software during transformer operation. The load adjustment is: it can be seen from the calculation of load formula that the large rate of transformer does not occur when the load is full, Generally, it is about 50%, but when selecting the transformer capacity, we should select effective transformers according to the load condition and load, so as to make the transformer in the situation of economic development and achieve the goal of power saving.

Power transformers are used in all walks of life

Zhangui Nora.For example, in the 1970s, the radio programs applied by every family in the countryside had a ground wire, and they were often wet with tap water. Protective grounding is to bury the copper plate of metal electrical conductor in the soil layer, and then lead a point of it out of the road with transmission line, which completes the grounding protection. The grounding wire specifies the grounding wire resistance ≤ 4Ω. Grounding protection is a safeguard measure adopted to avoid safety accidents when using household appliances, office and other electrical equipment.

According to the condition of cracks,Zhangui NoraHow much is a 400 KVA box transformer, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.

Power transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage, and can be equipped with safety protective casing according to different waterproof grades. It is applicable to key or unique natural environment sites such as multi-storey buildings, commerce, tunnel construction, chemical enterprises and factories.